Projects

category:

Lafarge Cement S.A.

Cement and lime industry

Replacing protection devices with multiMUZ drivers; works included the development of a control software, preparation of electrical documentation; old protection devices were removed, and replaced with new drivers with connections.

Lafarge Cement S.A.

Cement and lime industry

A pumping station power supply system was designed and included equipping a 6 kV switchboard, placing, cable route, developing, installing a transformer station and equipping a pump container.

Lafarge Cement S.A.

Cement and lime industry

Installation and the start-up of a fire protection system for the alternative fuels kiln system, included mechanical and electrical works related to connecting the system.

Ciech Soda Polska S.A.

Chemical industry

Delivery and installation of a CMI&A to operate a gas compressor; within the investment’s framework LV, MV and CMI&A, a MV switchboard and a control cabinet for the PCS7 system.

Instel S.C.

Other

Building a MV station including transformer station equipment, MV and LV fields, installation of devices in the station, and cable routing prefabrication along with the full start-up of the station.

Saint Gobain Polska Sp. z o.o.

Other

Modernization of the hydraulic press control system, including preparation of the new electrical documentation, CMI&A components replacement, creating software for PLC controllers and HMI visualizations.

Load more